Skip to main content

Welcome Back to the Westside, K Ingleside Trains!

Welcome Back to the Westside, K Ingleside Trains!
By

Pre-pandemic photo of K Ingleside train exiting tunnel at West Portal

The K Ingleside exiting the subway at West Portal

On April 16, the SFMTA, along with Mayor Breed and District 7 Supervisor Myrna Melgar, announced that Muni’s K Ingleside trains will return to the westside starting May 15.

The return of these trains is happening much earlier than anticipated thanks to the hard work of SFMTA staff to find creative solutions to ramp up Muni service to riders and support the city’s economic recovery. 

“This addition of Muni service is a true testament to the collaboration between Muni staff, our labor unions and community partners,” said Julie Kirschbaum, SFMTA Director of Transit. “We know that key transit connections are critical to the city’s economic recovery, and we’re thrilled to re-open the subway and ramp up service.” 

The K Ingleside will join the previously-announced N Judah as part of Muni Metro’s reopening, highlighting the agency’s commitment to maximizing transit access citywide. Recent subway repairs enable the K Ingleside to be interlined with the T Third line and run through a much more reliable subway system.

The pandemic enabled us to accelerate other upgrades and necessary maintenance work, provided by a rare, extended subway shutdown. These are part of the Subway Renewal Program, a systematic approach to upgrades over the next 10 years that addresses both longstanding issues predating the pandemic and other issues uncovered since the shelter-in-place began.

Key improvements include:

  • Wi-Fi availability for customers from routers installed in stations and cellular antennas installed in the tunnels
  • Installation of new wayfinding and directional signs at Castro and Church stations
  • Quicker and smoother trips as a result of overhead line enhancements and rail grinding

The return of K Ingleside rail service is only one part of a larger roll out of Muni Metro rail updates happening May 15:

K Ingleside/T Third 

K Ingleside and the T Third will once again be “interlined.” This means that the two routes will operate as one route, from Balboa Park to Sunnydale, providing subway service at all stations from Embarcadero to West Portal. 

 N Judah 

The N Judah is also returning to rail service. Riders will have more room and fewer pass ups, as the two-car train increases the N Judah’s capacity.

J Church, L Taraval and M Oceanview

These lines will all continue to operate as they currently do, though the increased capacity on the K/T trains will soon provide even better connections for those traveling downtown or to the western neighborhoods.  

  • The J Church will remain as a surface-only route from Duboce Avenue to Balboa Park
  • The L Taraval will operate with buses from the Zoo to Downtown 
  • The M Ocean View will operate with buses from Balboa Park to West Portal Station.

 



Published April 19, 2021 at 11:43PM
https://ift.tt/2RIMvJv

Comments

Popular posts from this blog

News from the WHO: The ceasefire in Gaza brings hope, but immense challenges lie ahead to restore the health system

Published on January 19, 2025 View on website

Have Feedback on the COVID-19 Muni Temporary Service Plan?

Have Feedback on the COVID-19 Muni Temporary Service Plan? By Shalon Rogers In March 2020, due to unprecedented constraints on resources brought on by the COVID-19 pandemic, the SFMTA had to make significant transit service reductions. As of January 2021, the agency has been able to restore service to a level where 91% of San Franciscans are within a quarter mile of a transit stop. This is reflected in the SFMTA’s current  COVID-19 Temporary Service Plan .   ' COVID-19 Temporary Service Plan Map The SFMTA is committed to ensuring that our programs and services are  compliant with Title VI of the Civil Rights Act of 1964  and therefore do not have a discriminatory impact based on race, color or national origin. As part of this work, we conducted a Title VI service equity analysis to evaluate the current COVID-19 Temporary Service Plan. The results of this analysis will be presented to the ...

Scooter Permittees Receive Feedback from Students with Disabilities

Scooter Permittees Receive Feedback from Students with Disabilities By Maddy Ruvolo On a recent Monday in Golden Gate Park, 28 students and staff from AccessSFUSD gathered on JFK Drive to test-ride adaptive scooters. The group took turns riding adaptive devices from two scooter companies permitted to operate in the city, Lime and Spin . Adaptive devices are designed to meet the needs of riders with a variety of disabilities and provide additional stability features, such as a seat, a wider base, and an additional wheel. After trying the scooters, the students shared their feedback about a variety of design elements, including the wheels, seat, throttle, basket location, foot plate width, and the ease of getting started.  Adaptive scooter demo in Golden Gate Park Students embraced the opportunity to ride scooters and provide feedback. AccessSFUSD is a community-based program for students 18-22 with disabilities. Located across 11 sites in San Francisco, the program focuses o...