Skip to main content

Smarter Traffic Signals Prioritize Transit and People

Smarter Traffic Signals Prioritize Transit and People
By Robert Lim

Have you ever wondered how traffic signals could better balance the needs of all road users, whether driving, bicycling, walking or taking Muni? The SFMTA is rolling out its Connected Corridor Pilot this month to use transit platform and traffic signal sensor data to inform signal timing adjustments. The pilot also aims to collect information to support transit efficiency and street safety improvements.  Traffic engineers use signal timing adjustments as a tool to prioritize the flow of travel in specific directions or for different travel modes – Muni, people walking or driving – to meet the changing demands of the road network across different timepoints in a day.

The Connected Corridors Pilot seeks to push the envelope of innovation by investing in advanced technologies, funded through a U.S. Department of Transportation (USDOT) grant. These tools will better position the city to serve the potential future needs and differing priorities of various roadway users.  At the same time, the project will implement near-term improvements to our street network to make it safer and smarter. Our goal is to provide greater mobility for all users of San Francisco streets.

The sensors are mounted on traffic signal poles and transit platforms and can classify objects by size, speed and direction at a frequency of multiple times per second.  The data collected from these sensors will serve two main purposes – prioritize transit, emergency vehicle and pedestrian flows and  build dashboards to improve our data-driven decision-making processes.

Sensor mounted on a traffic signal pole

Sensor mounted on a traffic signal pole

The pilot will take place along 3rd Street at 10 intersections in the Mission Bay neighborhood.  This corridor was selected based on the presence of upgraded traffic signal infrastructure and the opportunity to explore several operational challenges:

  • Accommodating the time needed for people walking in crosswalks on wide streets while also prioritizing an extended green light for transit
  • Reduced ability to prioritize signal timing in both directions of travel because of frequent  transit operating in both north and south directions of 3rd Street
  • High volumes of people walking and bicycling due to the presence of a hospital, research hub, waterfront and two sports facilities in the area
  • Variable waiting times for passengers to exit and enter at Muni Metro platforms impact the predicted arrivals of Muni vehicles on green lights further down the line

Muni Metro traveling on 3rd Street

Muni Metro traveling on 3rd Street

These challenges provide opportunities for innovation. The project team seeks to build and test an integrated technical solution using real-time data and advanced traffic flow algorithms. These tools can  dynamically adjust the signal phasing based on actual traffic flow conditions and the presence of people using various transportation modes.  Real-time data availability and analysis will enable more precise predictions of when the train will reach the downstream intersections so that a green light is more likely to be provided, thus reducing the amount of time people on the transit are stopped at red lights.

Sensor installation is completed with the overall project scheduled to be completed by the fall. Check the project webpage to see future updates on project status, data analysis and reports.

 



Published May 27, 2021 at 11:57AM
https://ift.tt/3wDtp72

Comments

Popular posts from this blog

News from the WHO: The ceasefire in Gaza brings hope, but immense challenges lie ahead to restore the health system

Published on January 19, 2025 View on website

Scooter Permittees Receive Feedback from Students with Disabilities

Scooter Permittees Receive Feedback from Students with Disabilities By Maddy Ruvolo On a recent Monday in Golden Gate Park, 28 students and staff from AccessSFUSD gathered on JFK Drive to test-ride adaptive scooters. The group took turns riding adaptive devices from two scooter companies permitted to operate in the city, Lime and Spin . Adaptive devices are designed to meet the needs of riders with a variety of disabilities and provide additional stability features, such as a seat, a wider base, and an additional wheel. After trying the scooters, the students shared their feedback about a variety of design elements, including the wheels, seat, throttle, basket location, foot plate width, and the ease of getting started.  Adaptive scooter demo in Golden Gate Park Students embraced the opportunity to ride scooters and provide feedback. AccessSFUSD is a community-based program for students 18-22 with disabilities. Located across 11 sites in San Francisco, the program focuses o...

Slow Streets are Full Steam Ahead

Slow Streets are Full Steam Ahead By Last week, the San Francisco Board of Supervisors ruled against four California Environmental Quality Act (CEQA) appeals that have been delaying Slow Streets, temporary emergency transit-only lanes, bike lanes and emergency street closures. Within 12 hours of the Board’s decision, SFMTA crews were back out in full force to implement these critical initiatives that help keep San Francisco moving during the pandemic.  The Board of Supervisors ruled unanimously that these temporary projects are deemed critical to the city’s emergency response efforts, preventing a further delay.  Implementation of new Slow Streets was put on hold while we waited for the appeals hearings, giving crews the opportunity to focus on filling in the signage gaps and repairing existing ...